Skip to scenario
Docs checked against releases

Find outdated statements before the release reaches customers

A release changes Forecasting export columns. Writers need to know which topics describe the old behavior, including references buried in other guides. Feature-to-content relationships can produce an inspectable impact list before customers discover the discrepancies.

See the comparison
The task in this example

Which pages need changes when release 26.4 changes the Forecasting export columns?

Business goal
Increase efficiency
Business metric
Docs ready at release

The release change should reach every affected statement

The same export change affects three topics in this collection. The comparison changes how those topics are located and checked.

Writers search without a feature map

The release ticket names the change, but nothing links the feature to its descriptions.

A search finds the main reference while two related topics retain the old column list.

Change
Export columns changed
Coverage check
Keyword search only
Remaining issue
Related topics missed
Customers can encounter outdated instructions

The impact list follows source relationships

The feature links to topics and elements describing its output.

The three affected topics are compared with the approved new behavior and routed to writers before release.

Change
Export columns changed
Coverage check
Feature relationships plus statement comparison
Remaining issue
Exceptions visible for review
The team can resolve the list in the release sprint

Make documentation readiness a checked release condition

Finding candidate pages is useful only when the flags are accurate and the resulting tasks are resolved. This scenario checks content against changes; it does not automatically rewrite the source.

  1. Find affected statements

    Follow changed features to their descriptions.

    • Affected items found
    • Time to impact list
  2. Confirm the flags

    Writers compare claims with approved behavior.

    • False flags
  3. Resolve before release

    Update and approve the necessary documentation.

    • Docs on release day
    • Outdated-doc tickets
Business metric

Docs ready at release

Track releases with all required documentation changes approved and available at the release milestone.

What to measure and how to interpret it

Create a reviewed affected set for representative release changes. Include indirect mentions and unchanged topics with similar vocabulary to test both omissions and false flags.

Affected items found
Share of the reviewed affected set identified by the check.
Time to impact list
Elapsed time from complete release evidence to a verified impact list.
False flags
Candidate items reviewed and found not to require a change, with the reason retained.
Docs on release day
Share of required changed topics approved and available at the agreed release milestone.
Outdated-doc tickets
Post-release contacts attributable to statements that should have changed.

Check the business result

Report readiness at the release level and inspect late or missed topics. Compare writer effort and post-release correction work as secondary efficiency measures; changes in release size affect the comparison.

Link a testable statement to the feature it describes

“Supports export” is difficult to compare with a release. An explicit column list tied to the feature and release gives reviewers a concrete claim to check.

Release 26.4 / Forecasting export
Release-impact record

Check export-column statements

Compare each source element describing export columns with the approved release 26.4 specification.

Change evidence
Reviewed export-column change
Feature
Forecasting export
Affected source
Reference and related task elements linked to the feature
Comparison
Current statement versus approved new column list
Disposition
Writer confirms update or records why no change is needed

Intelligent content

Write specific, testable behavior statements and give their elements stable identities.

Taxonomy

Share feature and release identifiers between change tickets and content.

Ontology and knowledge graph

Generate feature-to-topic and feature-to-element relationships from the source so an impact query can cross guide boundaries.

A practical starting point

Take one completed release and reconstruct the affected set manually. Compare relationship-based flags with what writers actually changed and what customers later reported.

Engineering establishes new behavior. Writers decide whether a flagged statement needs revision; work tracking assigns and closes the resulting tasks.

See how this scenario works
Lief
Lief
Amber
Amber
Dan
Dan
Explore the work with Intuitive Stack

How does your team know the release impact list is complete?

Intuitive Stack can help connect changed features to source statements and design a repeatable release check with your writers and engineering team.

  • Feature-to-content relationships
  • Testable behavior statements
  • Reviewed release-readiness evidence